Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online more than a week ago

Candidate

Male, 32 years, born on 18 July 1992

Considers offers

Minsk, willing to relocate (Spain, Cyprus, China, Mexico, USA, Sweden), prepared for business trips

Construction project manager

Specializations:
  • Production engineer, quantity surveyor
  • Construction project manager

Employment: full time, project work

Work schedule: full day, shift schedule, flexible schedule, rotation based work

Work experience 10 years 11 months

October 2019currently
5 years 7 months
Flex Rock

Sweden, www.flex-rock.com

Construction, Real Estate, Architecture... Show more

Construction project manager / Platschef
Installation works (walls, columns, floors, stairs, lift shafts) Reinforcement and concreting of walls and floors. Finishing works 1) Sweden, Örkeljunga, a complex of buildings: 2 buildings, 4 floors in each, the total area of 3100 square meters - in 9 weeks. * two weeks earlier than planned/ economic profit 2) Sweden, Malmö, a complex of 2 buildings; the first - 7 floors - total area 8650 square meters (excluding the basement - 1300 square meters); second - 4 floors, total area 1300 square meters - 36 weeks. * in time / without any deviations 3) Sweden, Bellisholm, two-story residential complex, 1100 square meters - in 4 weeks * profit 4) Sweden, Halmstad, a complex of 2 buildings, 3 floors in each. Total area 3200 square meters - in 9 weeks. * two weeks earlier than planned/ economic profit 5) Sweden, Bjuv, a complex of 3 buildings, 3 floors in each. Total area 4200 square meters - in 10 weeks * in time/ profit 6) Sweden, Ängelholm, reconstruction of parking with an increase in floors (assembly steel/ concrete elements, HDF/ Massive slabs, casting). Total area 2500 square meters - in 6 weeks *one week earlier than planned/ economic profit 7) Sweden, Malmö, total area 4000 square meters - in 16 weeks * in time / profit 8) Sweden, Malmö, a complex of 4 buildings; Total area 26000 square meters - 64 weeks 9) Norway, Oslo, assembly of the cross-laminated timber (CLT) in 26 weeks; total area 10000 square meters 10) Sweden, Stockholm, a complex of buildings. Total area 32000 square meters 11) Mexico, Monterray Bosch, assembly of the cross-laminated timber (CLT) 120 000 square meters Work with designers / suppliers / architectural supervision / manufacturers of structures from Poland / Germany / Sweden / Lithuania / Latvia / Estonia/ Mexico Duties: communicates with the customer; collects project requirements; coordinates and manages the budget; splits the project into small tasks; assigns tasks to performers, monitors time and resources; identifies and manages risks; controls the work; maintains project documentation; accepts the result of the work; presents the project to the customer.
February 2018July 2019
1 year 6 months
Agrostyle

Belarus, agrostyle.by/

Construction, Real Estate, Architecture... Show more

Project manager (civil construction and special works)
1) Construction of a complex of granaries and a feed mill with the installation of equipment in Tolochin 2) Construction of a complex of granaries and a feed mill with the installation of equipment, installation and commissioning of the entire complex of equipment for a livestock farm in the town of Vetka (Belynichesky District) 3) Construction of a complex of granaries and a feed mill with the installation of equipment in the town of Zhabinka 4) Installation of metal structures and installation of equipment to increase the grain loading capacity at the Rostov port facility **** Directly working with foreign customers/suppliers / installers: DANIELI (Italy), RIELA (Poland), MYSILO (Turkey), SKIOLD (Denmark), AWILA (Germany)
October 2016January 2018
1 year 4 months
Gomelremstroy

Utilities... Show more

Performance manager
Control over the production of works on the site. Interaction with the client at all stages of construction. Coordination of the stages of construction with representatives of the customer, technical supervision. Follow the instructions of the project manager. Technical support of technical documentation.
July 2015November 2016
1 year 5 months
Gomelkapitalstroy

www.gks.by

Construction, Real Estate, Architecture... Show more

Site manager (civil construction and special works)
Welding and installation work * Carrying out shutdown repairs of the ring furnace of JSC Tagmet, Taganrog; * Manufacturing of pipe assemblies and installation of copper and stainless steel pipelines for transporting liquid and gaseous aggressive media at the facility: OJSC "Belarusian Metallurgical Plant", Zhlobin; * Manufacturing of metal structures for the facility: Reconstruction of the Gomel CHPP-1 with the creation of a PGU-35 unit with the installation of a GTU-25, waste heat boiler and steam turbine; * Turnkey production of a workshop at the facility: OJSC "Metal structures" Gomel; * Installation of pipes and pipe assemblies of lines OV, VK, T1, T2, fire pipelines at the site: "8, 10, 12-storey residential building on Volotovskaya street, Gomel"
August 2014July 2015
1 year
Gomelkapitalstroy
Master (civil construction and special works)
• Construction of treatment facilities for RUE "Belarusneft-Osobino" near the agricultural town "Kommunar" in the Buda-Koshelevsky district. (installation of soft roofing, installation of metal structures, installation of roofing and wall sandwich panels, installation of light enclosing structures, finishing work, installation of door and window openings, installation of devices and automation systems) • Installation of metal structures of four pavilions on Sovetskaya Street in the area of ​​the Gomel department store (installation of metal structures) • Construction of a warehouse at OJSC "Metal structures" on Mogilevskaya street, 29 in Gomel (earthwork, installation of foundations, concrete work, installation of metal structures, installation of wall and roof panels) • "OJSC "BMZ". Organization of production of long products with the construction of a small-section wire mill: o Welding of anchors in a heating furnace before lining in the amount of 58,000 thousand pieces. o Installation of air (IA), nitrogen (NI) process piping around the heating furnace. o Installation of stainless steel process pipelines in the water treatment building (MW). o Installation of technological equipment in the water treatment building. o Installation of hydraulic process pipelines (HP, HT, HD lines), water supply circulation (CW, CWR), air (IA) section KS-11. o Installation of heating system pipelines in the production building. o Installation of steam process pipelines in the "On-site heating networks" section.
December 2013March 2014
4 months

Construction, Real Estate, Architecture... Show more

Ancillary Worker
Production of concrete and plaster works

Skills

Skill proficiency levels
Advanced level
MS Outlook
AutoCAD
Internet
Development
Medium level
Google SketchUp
MS PowerPoint
Level not specified
Health and Safety
Schedule management
Training and Development
Budget Management
Lifecycle project competence
Stakeholder management
Excellent customer relations
Cost Control
Building site supervision
Baseline schedules creation
Blueprints
Risk mitigation and control
Project planning

Driving experience

Own car

Driver's license category A, B

About me

Currently, I am taking advanced training courses in "Project Management," where I study both classical and agile project management methodologies. Simultaneously, I am preparing for the PMI certification exam. -Experience in managing projects of varying complexity, including leading projects from initiation or joining ongoing projects. -Leadership qualities: Ability to inspire, motivate, and guide a team in the right direction. Willingness to make decisions and take personal responsibility for them. -Communication skills: Effective communication with team members, clients, and other stakeholders. -Organizational skills: Ability to efficiently plan, manage resources, set priorities, and monitor task progress. -Flexibility and adaptability: Ability to be flexible and adapt to changes in project scope or conditions. -Technical understanding: Depending on the nature of the project. -Risk management skills: Ability to identify and assess risks, as well as develop strategies for their management. -Analytical skills: Ability to analyze data and make informed decisions based on project progress information. -Teamwork: Ability to collaborate effectively with diverse team members, stimulate their interaction, and resolve conflicts. -Time management: Effective time and deadline management are crucial for the successful completion of projects on schedule. -Teachability: Commitment to continuous learning and adapting to new project management methodologies and technologies. -Responsibility: Willingness to take responsibility for project outcomes and the process of its implementation. -Proficiency in project management methodologies: Knowledge and experience in applying various methodologies such as Agile, Scrum, Waterfall, primarily in construction projects. -Budgeting and financial literacy: Developing and managing the project budget, as well as understanding the financial aspects related to the project. -Use of project management tools: Experience with tools such as Microsoft Project, Bitrix 24, Project Manager. -Stakeholder management: Skills in interacting and communicating with various project stakeholders. -Competence in quality assurance: Knowledge of quality assurance methods and task control to achieve high standards. -Presentation skills: Ability to present project results and communicate with clients, the team, and other stakeholders. -Data analysis ability: Skills in analyzing data to make informed decisions based on facts. I took a direct part in the selection of personnel in the work teams and employees. English level C1

Portfolio

Higher education (master)

2015
Faculty of Master's Training, Construction. Organization and control

Languages

BelarusianNative


EnglishC1 — Advanced


RussianC2 — Proficiency


SpanishA2 — Elementary


SwedishA2 — Elementary


Professional development, courses

2024
Business Analysis Basic
Institute of IT & Business Administration
2023
Fundamentals of project management (classical and flexible approaches)
Institute of IT & Business Administration, Project Management
2021
Sakra lyft/ Lastkopplare
Consulte, Slingerman
2019
Hot works
APEK
2018
Carrying out work in explosive environments
Belstroycenter, Installation, maintenance and adjustment of industrial equipment
2018
Foreman (general construction work)
Belstroycenter, Civil works
2017
master (installation of heat and water consumption meters)
Belstroycenter
2017
FRONT-END DEVELOPMENT TRAINING
EPAM, FRONT-END
2015
master (pipeline protection, installation of insulating coatings)
Belstroycenter
2015
master (installation of internal and external networks and heat supply systems, installation of ventilation and air conditioning systems)
Belstroycenter
2015
Carrying out work using fire retardants
State Educational Institution "Gomel Engineering Institute" of the Ministry of Emergency Situations of the Republic of Belarus

Tests, examinations

2021
Byggbranschens Utbildningscenter
Byggbranschens Utbildningscenter, Safe Construction Training
2021
Consulté Courses
Consulté Courses, Fallskydd

Citizenship, travel time to work

Citizenship: Belarus

Permission to work: Belarus, Mexico, Sweden

Desired travel time to work: Doesn't matter